Metric Leveling Feet

First: Choose a footpad size and material type.  Second: in the drop down menu choose the stud length.

Framing Tech standard is to install all leveling feet with a 2" exposed gap between the floor and the connected extrusion.  Below are only some of our leveling options.  Don't see what you need here?  Please contact us!

All leveling feet can pivot 20° from center:

leveling-foot-deflection.jpg

Top

Quote Request

Please include your contact information and details of your request below.

(* required fields)